Integrated Waste Management System Alba
Published on 28 October 2021

Romania
Centru
Project Manager
About this good practice
The practice was implemented within the Integrated Waste Management System Project financed by the Sectoral Operational Program Environment, Priority Axis 2 - Development of Integrated Waste Management Systems and rehabilitation of contaminated sites and the Project “Phase of the Integrated Waste Management in Alba County ”funded by the Large
The aims of the project were the construction of an ecological landfill in accordance with European requirements, construction of transfer stations, sorting and mechano-biological treatment facilities, closing and rehabilitating existing storage sites that do not comply with European requirements.
Through the project were built 2 transfer stations , the Tărtăria transfer station with a capacity of 33044 t / year and the Blaj transfer station with a capacity of 15000 t / year. The collected waste is transported to treatment and disposal facilities .
The sorting station has a capacity of 42213 tons / year and ensures the sorting of the dry fraction collected separately. The mechanical-biological treatment plant has a capacity of 85566 tons / year and ensures the treatment of the wet fraction (residual and biodegradable waste).
The warehouse, with an estimated lifespan of 21 years, has 2 cells and a total volume of 1926000 m3. The first cell is built and has a lifespan of 5.5 years and a volume of 543,000 cubic meters.
The main beneficiaries of this good practice are the population of Alba County.
The aims of the project were the construction of an ecological landfill in accordance with European requirements, construction of transfer stations, sorting and mechano-biological treatment facilities, closing and rehabilitating existing storage sites that do not comply with European requirements.
Through the project were built 2 transfer stations , the Tărtăria transfer station with a capacity of 33044 t / year and the Blaj transfer station with a capacity of 15000 t / year. The collected waste is transported to treatment and disposal facilities .
The sorting station has a capacity of 42213 tons / year and ensures the sorting of the dry fraction collected separately. The mechanical-biological treatment plant has a capacity of 85566 tons / year and ensures the treatment of the wet fraction (residual and biodegradable waste).
The warehouse, with an estimated lifespan of 21 years, has 2 cells and a total volume of 1926000 m3. The first cell is built and has a lifespan of 5.5 years and a volume of 543,000 cubic meters.
The main beneficiaries of this good practice are the population of Alba County.
Resources needed
47,20 mil. EURO:
- 6,68 mil. € state budget
- 36,20 mil. € european funds.
- 0,43 mil. € - Local budget
- 3,89 mil. € - indirect costs
- 6,68 mil. € state budget
- 36,20 mil. € european funds.
- 0,43 mil. € - Local budget
- 3,89 mil. € - indirect costs
Evidence of success
Results:
• C.M.I.D Galda de Jos, composed of ecological warehouse (capacity of 543,000 m3),
• Sorting station (capacity 43,000 t / year) and simple mechano-biological treatment station (capacity 85,566 t / year);
• Blaj waste transfer station: capacity 15,000 t / year;
• Tărtăria waste transfer station: capacity 33,044 t / year;
• Closure of seven non-compliant landfills: Abrud, Aiud, Alba Iulia, Blaj, Cîmpeni, Cugir and Ocna Mureş.
• C.M.I.D Galda de Jos, composed of ecological warehouse (capacity of 543,000 m3),
• Sorting station (capacity 43,000 t / year) and simple mechano-biological treatment station (capacity 85,566 t / year);
• Blaj waste transfer station: capacity 15,000 t / year;
• Tărtăria waste transfer station: capacity 33,044 t / year;
• Closure of seven non-compliant landfills: Abrud, Aiud, Alba Iulia, Blaj, Cîmpeni, Cugir and Ocna Mureş.
Potential for learning or transfer
The GP can be replied by other partners or other cities in EU in order to improve their waste management
Further information
Website
Good practice owner
Organisation
Alba County Council

Romania
Centru
Contact
Project Manager