Bird Rock is built by cleaning and reusing of 90.000 m3 contaminated soil and nowadays the structure provides a safe breeding ground for multiple bird species.
Integrated waste management plant in Koshie (Cyprus)
The Waste Management Plant in Koshi receives all the municipal waste from the Districts of Larnaka, Ammochostos and Nicosia and aims to avoid illegal dumping.
Quality management plan: Monitoring technical elements during construction works
Surface capping and basal liners have to meet defined technical standards. The monitoring of the installed quality is defined in the quality management plan.
Brandenburg policy: Classification of closed landfills with small volume in a rural area
Brandenburg police to classificate small landfills in a rural area, ruled by the “Guideline for closing measures of landfills with low risk potential”.
Technical elements in landfills: A quality guarantee of 100 years
Sealing and systems have to fulfill certain standards. One of the basic requirements for all technical facilities is the guaranteed functionality for 100 years.
Brandenburg policy: Remediation of closed landfills with small volume in a rural area
Brandenburg police to remediate small landfills in a rural area, ruled by the “Guideline for closing measures of landfills with low risk potential”, from 1994.
Waste Management on operational landfills: German Legislation and Criteria for the Deposition
In order to avoid chemical reactions within the landfill body and to assure structural stability, several criteria are set for the waste quality and disposal.